Diageo Bonded Warehouses, Alloa
Muir Construction is leading the development of vast new bonded warehouses for Diageo in Alloa — a long-term, multi-year construction project requiring reliable, high-quality visual documentation in a remote location. To capture progress over several years, Muir partnered with Time-Lapse Solutions to install a fully solar-powered, long-duration time-lapse system.
Given the site’s scale and the project’s extended duration, uninterrupted operation was essential. Time-Lapse Solutions provided a bespoke solar system featuring ultra-efficient, low-power camera equipment powered by lithium batteries and dual 180W solar panels. This robust setup ensures continuous performance through the darkest winter months, maintaining stable operation without reliance on mains power.
Our local team provides ongoing support and proactive maintenance, guaranteeing fast response times should any issue arise. This combination of advanced technology and dependable service has ensured seamless operation and consistent delivery of high-quality imagery throughout the project.
The result is a fully autonomous, resilient time-lapse solution that gives Muir Construction and Diageo complete visibility of progress at every stage. The client is delighted with both the performance of the system and the reassurance that comes from having a trusted, responsive partner supporting such a critical, long-term project.